Product Description:
Frame typeSpatial anisotropic structure
Project nameSteel structure building
AppilcationTerminal
ServiceEPC service, Design,manufacturing,shipment and installation
Desing standardAISI、ASTM、BS、DIN、GB、JIS
Desing softwarePKPM, 3D3S, SAP2000, Midas Gen, and STAAD
Capacity2000m²/3000m²/5000m²/10,000m²/20,000m² based on requirement
CertificateSGS,CE,CWB,AISC,EAC
Roof/Wall materialFirst-level waterproofing Steel sheet/PU sandwich panel/EPS sandwich panel/PIR sandwich panel/Fiberglass wool sandwich panel
DecorationAluminum-plastic panel/Curtain wall/Aluminum sheet/Cement fiberboard, Aluminum-magnesium-manganese board
DoorCustomized super big door with good performance motor
PaintingEpoxy zinc-rich, galvanized
Place of loadingQingdao, China


PRODUCT DETAILS

What is the design duration of the terminal?
We have a professional and highly skilled design team consisting of 70 members. For the construction of the terminal, one architect and three designers are required. It usually takes about two months to provide the design plans and drawings. In fact, we also highly appreciate that customers seek technical support from us and we will provide subsequent drawing coordination and processing and production to help customers realize the project implementation.


What level of processing capacity does the terminal?
We have 5 factories with over 800 employees,and we have advanced laser cutting machines that can achieve first-class weld seams. Shot blasting is Sa2.5 above. We have obtained certifications from CWB, AISO and ECA, as well as SGS and CE certificates. We are also capable of accepting on-site supervision of production by third-party inspection agencies and accept pre-assembling to ensure on-site installation compatibility.


When will the shipment be made?
For such projects like the terminal, after the shop drawings and Tekla model are confirmed, the first batch of steel columns and steel beams can be delivered for on-site installation within 40 days, final batch within 70 days