High level parking construction

Steel structure parking building
High level parking construction
steel structure multi level parking building
Steel structure parking building
High level parking construction
steel structure multi level parking building

High level parking construction

Product Description:
Frame typeFrame structure
Project namePrefabricated steel structure building
AppilcationParking building
ServiceEPC service, Design,manufacturing,shipment and installation
Desing standardAISI、ASTM、BS、DIN、GB、JIS
Desing softwarePKPM, 3D3S, SAP2000, Midas Gen, and STAAD
Capacity2000m²/3000m²/5000m²/10,000m²/20,000m² based on requirement
CertificateSGS,CE,CWB,AISC,EAC
RoofFirst-level waterproofing Steel sheet/PU sandwich panel/EPS sandwich panel/PIR sandwich panel/Fiberglass wool sandwich panel
Level2/4/6/8 levels based on requirement
PaintingEpoxy zinc-rich, galvanized
Place of loadingQingdao, China


PRODUCT DETAILS

What is the design duration of the Parking building?
We have a professional and highly skilled design team consisting of 70 members. For the construction of the School/Supermarket, one architect and three designers are required. It usually takes about two months to provide the design plans and drawings. In fact, we also highly appreciate that customers seek technical support from us and we will provide subsequent drawing coordination and processing and production to help customers realize the project implementation.

What level of processing capacity does the Parking building?
We have 5 factories with over 800 employees,and we have advanced laser cutting machines that can achieve first-class weld seams. Shot blasting is Sa2.5 above. We have obtained certifications from CWB, AISO and ECA, as well as SGS and CE certificates. We are also capable of accepting on-site supervision of production by third-party inspection agencies and accept pre-assembling to ensure on-site installation compatibility

When will the shipment be made?
For such projects like the terminal, after the shop drawings and Tekla model are confirmed, the first batch of steel columns and steel beams can be delivered for on-site installation within 40 days, final batch within 60 days


What is the design capacity of the Parking building?

We can use software for design including PKPM, 3D3S, SAP2000, Midas Gen, and STAAD. And provide the Tekla model as well. Connect directly with the client's designer. The architect is in charge of the overall layout and material selection of the project, truly ensuring customer satisfaction.

Where is the factory located for processing and transportation?
We conduct the processing in Qingdao, a beautiful coastal city. In 2008, the Olympic maritime sports event was held in Qingdao. It is close to the port and around 1.5 hours, which helps reduce transportation costs.


Can you send engineers or whole team to install my project

Yes, we will send you the detailed installation drawing and video for free, we can provide the service of installation,

supervision, and training by extra. We can send our professional technical team to supervise installation on site overseas.