| Frame type | Truss frame |
| Project name | Multifunctional prefabricated steel structure building |
| Appilcation | Gym/ Concert |
| Service | EPC service, Design,manufacturing,shipment and installation |
| Desing standard | AISI、ASTM、BS、DIN、GB、JIS |
| Desing software | PKPM, 3D3S, SAP2000, Midas Gen, and STAAD |
| Seat capacity | 5000/10000/20000 based on requirement |
| Certificate | SGS,CE,CWB,AISC,EAC |
| Wall material | Aluminum sheet, aluminum-magnesium-manganese sheet, film |
| Painting | Epoxy zinc-rich, galvanized |
| Place of loading | Qingdao, China |
What is the design duration of the gymnasium?
We have a professional and highly skilled design team consisting of 70 members. For the construction of the gymnasium, one architect and three designers are required. It usually takes about two months to provide the design plans and drawings. In fact, we also highly appreciate that customers seek technical support from us and we will provide subsequent drawing coordination and processing and production to help customers realize the project implementation.
What level of processing capacity does the steel structure have?
We have 5 factories with over 800 employees,and we have advanced laser cutting machines that can achieve first-class weld seams. Shot blasting is Sa2.5 above. We have obtained certifications from CWB, AISO and ECA, as well as SGS and CE certificates. We are also capable of accepting on-site supervision of production by third-party inspection agencies and accept pre-assembling to ensure on-site installation compatibility