| Frame type | Arch bridge structure |
| Project name | Prefabricated Engineer building |
| Appilcation | Bridge |
| Service | EPC service, Design,manufacturing,shipment and installation |
| Desing standard | AISI、ASTM、BS、DIN、GB、JIS |
| Desing software | PKPM, 3D3S, SAP2000, Midas Gen, and STAAD |
| Certificate | SGS,CE,CWB,AISC,EAC |
| Exterior decoration | Glass curtain wall/Aluminum-plastic panel/Big canopy |
| Painting | Epoxy zinc-rich, galvanized |
| Place of loading | Qingdao, China |
What is the design duration of the Overpass bridge?
We have a professional and highly skilled design team consisting of 70 members. For the construction of the Overpass bridge, one architect and one designers are required. It usually takes about two months to provide the design plans and drawings. In fact, we also highly appreciate that customers seek technical support from us and we will provide subsequent drawing coordination and processing and production to help customers realize the project implementation.
When will the shipment be made?
For such complex projects like the big shopping mall, after the shop drawings and Tekla model are confirmed, the first batch of steel columns and steel beams can be delivered for on-site installation within 40 days, second batch within 60 days and final batch 80 days.
What is the design capacity of the Overpass bridge?
We can use software for design including PKPM, 3D3S, SAP2000, Midas Gen, and STAAD. And provide the Tekla model as well. Connect directly with the client's designer. The architect is in charge of the overall layout and material selection of the project, truly ensuring customer satisfaction.