| Frame type | Space frame |
| Project name | Prefabricated steel structure building |
| Appilcation | Hangar |
| Service | EPC service, Design,manufacturing,shipment and installation |
| Desing standard | AISI、ASTM、BS、DIN、GB、JIS |
| Desing software | PKPM, 3D3S, SAP2000, Midas Gen, and STAAD |
| Capacity | 2000m²/3000m²/5000m²/10,000m²/20,000m² based on requirement |
| Certificate | SGS,CE,CWB,AISC,EAC |
| Roof/Wall material | Steel sheet/PU sandwich panel/EPS sandwich panel/PIR sandwich panel/Fiberglass wool sandwich panel |
| Height | 10m/11m/12m |
| Door | Customized super big door with good performance motor |
| Painting | Epoxy zinc-rich, galvanized |
| Place of loading | Qingdao, China |
What is the design duration of the hangar?
We have a professional and highly skilled design team consisting of 70 members. For the construction of the hangar, one architect and one designers are required. It usually takes about two months to provide the design plans and drawings. In fact, we also highly appreciate that customers seek technical support from us and we will provide subsequent drawing coordination and processing and production to help customers realize the project implementation.
Where is the factory located for processing and transportation?
We conduct the processing in Qingdao, a beautiful coastal city. In 2008, the Olympic maritime sports event was held in Qingdao. It is close to the port and around 1.5 hours, which helps reduce transportation costs.